Watershed - Flambeau Flowage (UC14)
Flambeau Flowage Watershed

Details

The Flambeau Flowage Watershed is located primarily in Iron County with smaller sections in northwest Vilas County and northern Price County. It has an area of 247 square miles. The Turtle-Flambeau Flowage is the largest waterbody at 12,942 acres. There are numerous other lakes. The Turtle River passes through many of the lakes and is the largest stream. The lower end of the Manitowish River is also present. The watershed is minimally developed, with 99% of its area consisting of forest, wetland, and open water.

Date  2011

Population, Land Use

About half (47%) of the total area in the Flambeau flowage watershed is covered by forests, and another third is wetlands. The third most common land use is open water, which accounts for almost one-fifth of the total area. Agriculture only accounts for one-half of a percent of the watershed’s total area, and grasslands and suburban environments each cover less than one-fifth of one percent. Urban landscapes are scarcer still in the Flambeau Flowage Watershed, amounting to only three-hundredths of one percent of the total area.

Date  2011

Nonpoint and Point Sources

Lakes and streams in the Flambeau Flowage Watershed have not been ranked for nonpoint source pollution (NPS). Groundwater in the watershed has been ranked as low for NPS, which the watershed as a whole ranks as well.

Date  2011

Ecological Landscapes for Flambeau Flowage Watershed

Ecological Landscapes

The Flambeau Flowage Watershed is located in two ecological landscapes: the North Central Forest and the Northern Highland. The North Central Forest Ecological Landscape occupies much of the northern third of Wisconsin. Its landforms are characterized by end and ground moraines with some pitted outwash and bedrock controlled areas. Kettle depressions and steep ridges are found in the northern portion. Two prominent areas in this Ecological Landscape are the Penokee-Gogebic Iron Range in the north extending into Michigan, and Timm's Hill, the highest point in Wisconsin (1,951 feet) in the south. Soils consist of sandy loam, sand, and silts. The vegetation is mainly forest, with many wetlands and some agriculture, though the growing season is not as favorable as it is in southern Wisconsin. Lake Superior greatly influences the northern portion of the Ecological Landscape especially during the winter season, producing greater snowfall than in most areas in Wisconsin. The historic vegetation was primarily hemlock-hardwood forest dominated by hemlock, sugar maple, and yellow birch. There were some smaller areas of white and red pine forest scattered throughout the Ecological Landscape, and individual white pines trees were a component of the hemlock-hardwood forest. Harvesting hemlock to support the tanneries was common at the turn of the century, and the species soon became a minor component of forests due to over-harvesting and lack of regeneration. Currently, forests cover approximately 80% of this Ecological Landscape. The northern hardwood forest is dominant, made up of sugar maple, basswood, and red maple, and also including some scattered hemlock and white pine pockets within stands. The aspen-birch forest type group is also relatively abundant, followed by spruce-fir. A variety of wetland community types also are present, both forested and non-forested. The Northern Highlands Ecological Landscape is located in northern central Wisconsin. It is known for its pitted outwash plains and kettle lakes mixed with extensive forests and large peatlands. Its landforms are characterized mainly by pitted outwash but also contain some coarse-textured moraines. Soils are acidic and relatively unproductive due to low moisture-holding capacity and lack of organic matter. Historically, this was Wisconsin's greatest pinery. White and red pine forests largely dominated the vegetation, with some smaller pockets of jack pine. On the more mesic soils, hemlock-hardwood forests were common. Aspen-birch forests occurred in openings formed by disturbance events such as wind or fire. Current forest vegetation is primarily aspen, with some white, red and jack pine in both natural and plantation form. Northern hardwood forests, though reduced in extent, still occur on the more mesic soils. Lowland conifer occupies the many peatlands that are scattered throughout the Ecological Landscape.

Date  2010

Hydrologic Features

The dominate influences on the hydrology of the Flambeau Flowage Watershed are the ecological landscape and the numerous large dams within the watershed. The watershed is located in northern Wisconsin and sits within the Northern Highlands and North Central Forest ecological landscapes. Both landscapes are characterized by pitted glacial outwash plains of sandy soils with numerous kettle lakes and forested wetlands. The combination of the cool northern climate, sandy soils, and numerous lakes and wetlands have prevented the widespread development of agriculture within the watershed and consequently much of the land use remains forest, wetlands or lakes. The land use and soil types within the watershed creates ideal conditions for rain fall and snow melt to infiltrate into the alluvial aquifer that has formed within the glacial outwash. This shallow alluvial aquifer is confined by the underlying layer of impermeable Precambrian bedrock and consequently groundwater reaches the surface where the layer of glacial alluvium is thin or pitted; making the alluvial aquifer the primary source of water in many of the kettle lakes and wetlands in the watershed. The rich forests of the watershed attracted the attention of the timber industry around the turn of twentieth century, but the slow flowing, intermittent streams that drained the lakes and wetlands within the region did not supply the hydropower necessary to operate mills or float logs downstream. To support the timber industry several large dams were built within the watershed to create the necessary hydraulic gradient to generate hydropower. The rise in water levels behind the dams transformed the numerous small lakes and adjacent wetlands into large lakes with regulated outflows. While the consequences of these dams on the hydrology and aquatic ecosystem of this watershed is difficult to quantify, they have altered the way water, nutrients, pollutants, and the biota move through the watershed.

Date  2011

Flambeau Flowage Watershed At-a-Glance

Impaired Water in Flambeau Flowage Watershed
River and Stream QualityAll Waters in Watershed

According to the WDNR’s Register of Waterbodies (ROW) database, there are over 349 miles of streams and rivers in the Flambeau Flowage Watershed; 191 miles of these waters have been entered into the WDNR’s assessment database. Of these 191 miles, over one-third (36%) are meeting Fish and Aquatic Life uses and are specified as in “good” condition. The condition of the remaining stream miles is not known or documented. The first three miles of Pardee Creek from its mouth is considered a Class I trout water and Drinkwine Creek and Dollar Creek contain another six and a half miles of Class III trout water near their mouths. Segments of Manitowish River and Pardee Creek contribute 21 miles of Exceptional Resource Waters.

Date  2011

Watershed Trout Streams
Watershed Outstanding & Exceptional Resources

Lakes and Impoundments

The WDNR’s ROW database shows that there are over 9,277 acres of lakes and ponds in the Flambeau Flowage Watershed. There are also over 13,613 acres of reservoirs and flowages (12,942 acres from the Turtle Flambeau Flowage alone) and another 287 acres of unspecified open water in the watershed. A total of 10,259 lake acres has been entered into the state’s assessment database. Of these 10,259 acres, about 85% are indicated as supporting Fish and Aquatic Life uses. The remaining lake acres within the watershed have not been assessed for Fish and Aquatic Life use support. A couple hundred lake acres within the Flambeau Flowage Watershed have also been assessed and found to support their Recreation use designations. However, over eighteen hundred acres in the watershed are indicating as not supporting Fish Consumption uses. A total of 12,943 acres of impoundments has also been entered into the assessment database and 100% are indicated as supporting Fish and Aquatic Life uses. No impoundments have been assessed for any other use category, though. Cathrine Lake, Cedar Lake, Hewitt Lake, Owl Lake, Trude Lake, and Turtle-Flambeau Flowage have been singled out as Outstanding Resource Waters. The following lakes are all over one hundred acres in size (in order of descending surface area): Trude Lake, Birch Lake, South Turtle Lake, Fisher Lake, Long Lake, North Turtle Lake, Spider Lake, Lake of the Falls, Moose Lake, No Mans Lake, Pike Lake, Pardee Lake, Echo Lake, North Bass Lake, Cedar Lake, Mercer Lake, Boot Lake, Wilson Lake, Rainbow Lake, Grand Portage Lake, Martha Lake, Catherine Lake, Owl Lake, and Rice Lake.

Date  2011

Wetland Health

An estimated quarter (25%) of the current land use in the watershed is wetlands. Currently, about 93% of the original wetlands in the watershed are estimated to exist. Of these wetlands, the majority include forested wetlands (71%), scrub (25%), and emergent wetlands (3%), which include marshes and wet meadows. Of the 2,885 acres of estimated lost wetlands in the watershed, only approximately 13% are considered potentially restorable based on modeled data, including soil types, land use, and land cover.

Date  2011

Impaired Waters

Many lakes within the watershed are impaired by high mercury levels, including: Birch Lake, Long Lake, North Bass Lake, Owl Lake, Rock Lake, North and South Turtle Lake, Trude Lake, and Turtle-Flambeau Flowage.

Date  2011

List of Impaired Waters

Aquatic Invasive Species

Banded mystery snails are present in Echo Lake, Grand Portage Lake, Onland Lake, and Mercer Lake. Chinese mystery snails are present in Fisher Lake, Manitowish River, Spider Lake, and Weber Lake. Curly-leaf pondweed is found in Wilson Lake. Eurasian water-milfoil are present in Long Lake and Long Lake Creek. Furthermore, rusty crayfish have been found in Birch Lake, Manitowish River, Turtle Lake, North, Turtle Lake, South, and Cedar Lake.

Date  2011

Fish Consumption Advice

Wisconsin’s fish consumption advisory is based on the work of public health, water quality, and fisheries experts from eight Great Lakes states. Based on the best available scientific evidence, these scientists determined how much fish is safe to eat over a lifetime based on the amount of contaminants found in the fish and how those contaminants affect human health. Advisories are based on concentrations of the following contaminants along with angler habits, fishing regulations, and other factors. The following waterbodies have had a specific fish consumption advisory in effect for mercury since December of 2009: North Bass Lake, Owl Lake, Trude Lake, Turtle Flambeau Flowage, and Spider Lake Mercury affects the human nervous system. Mercury can damage developing brains of children and may affect a child’s behavior and ability to learn. While mercury can be eliminated from the body, frequent ingestion of fish with high levels of mercury results in bioaccumulation (Proposed Guidance for the Classification, Assessment, & Management of Wisconsin Surface Waters, Lowndes & Helmuth, March 12, 2007).

Date  2011

Groundwater

The following groundwater information is for Iron County (from Protecting Wisconsin’s Groundwater through Comprehensive Planning website, http://wi.water.usgs.gov/gwcomp/), which roughly approximates to the Flambeau Flowage Watershed. Mercer is the only municipal water system in the Flambeau Flowage Watershed to implement a wellhead protection plan. No animal waste management ordinances have been developed for the three counties into which the Flambeau Flowage Watershed extends: Iron, Vilas, and Price counties. From 1979 to 2005, total water use in Iron County has increased from about 400,000 gallons per day to about 970,000 gallons per day. The increase in total water use over this period is due primarily to increases in irrigation and public use and losses. The proportion of county water use supplied by groundwater has been consistently 100% for the period 1979 to 2000, and decreased sharply to 56% in 2005 due to a spike in irrigation use, which relied primarily on surface water sources, after 2000. Private Wells All 67 private well samples collected in Iron County from 1990 through 2006 met the health-based drinking water limit for nitrate-nitrogen. Land use affects nitrate concentrations in groundwater. An analysis of over 35,000 Wisconsin drinking water samples found that drinking water from private wells was three times more likely to be unsafe to drink due to high nitrate in agricultural areas than in forested areas. High nitrate levels were also more common in sandy areas where the soil is more permeable. In Wisconsin’s groundwater, 80% of nitrate inputs originate from manure spreading, agricultural fertilizers, and legume cropping systems. A 2002 study estimated that 18% of private drinking water wells in the region of Wisconsin that includes Iron County contained a detectable level of an herbicide or herbicide metabolite. Pesticides occur in groundwater more commonly in agricultural regions, but can occur anywhere pesticides are stored or applied. There are no atrazine prohibition areas in the Flambeau Flowage Watershed. The one private well sample collected in Iron County for arsenic met the health standard. Potential Sources of Contamination There are no concentrated animal feeding operations (CAFOs) in the Flambeau Flowage Watershed; nor are there any licensed landfills or Superfund sites within the watershed. WDNR’s Remediation and Redevelopment (RR) Program oversees the investigation and cleanup of environmental contamination and the redevelopment of contaminated properties. The RR Program provides information about contaminated properties and other activities related to the investigation and cleanup of contaminated soil or groundwater in Wisconsin through its Bureau for Remediation and Redevelopment Tracking System (BRRTS) database (WDNR 2010e). The database shows that there are six sites in the Flambeau Flowage Watershed that are specified as “open”, meaning “contamination has affected soil, groundwater, or more and the environmental investigation and cleanup need to begin or are underway.” These sites include four Leaking Underground Storage Tank (LUST) sites and two Environmental Repair (ERP) sites. The Petroleum Environmental Cleanup Fund Award (PECFA) program was created in response to enactment of federal regulations requiring release prevention from underground storage tanks and cleanup of existing contamination from those tanks. PECFA is a reimbursement program returning a portion of incurred remedial cleanup costs to owners of eligible petroleum product systems, including home heating oil systems. As of May 31, 2007, $4,997,735 has been reimbursed by the PECFA fund to clean up 38 petroleum-contaminated sites in Iron County. This equates to $769 per county resident, which is greater than the statewide average of $264 per resident.

Date  2011

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Rice Lake
Status
Complete

Rice Lake Association: Rice Lake Ais Management Plan: The Rice Lake Association is sponsoring a project to manage to population of Curly leaf pondweed (CLP) on Rice Lake. Project to be completed by December 31, 2023.

Project final deliverables include:
1. Results from hand-pulling efforts including time spent and amount removed
2. Annual AIS monitoring data/report
3. CBCW data entered into SWIMS
4. Final report

Specific project activities include:
1. AIS monitoring and reporting
2. Removal of CLP through hand-pulling and benthic barrier
3. Fisheries monitoring
4. CBCW efforts

Special Conditions: Monitoring design must get approval from DNR prior to management efforts. Per s. NR193.65(4) population management activities require minimum public boating access as set out in s. NR 1.91 (4) to be eligible for grant funds. The grantee is not eligible for reimbursement of expenses until these requirements are met.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Turtle River
Status
Complete

Rice Lake Association: Rice Lake Ais Management Plan: The Rice Lake Association is sponsoring a project to manage to population of Curly leaf pondweed (CLP) on Rice Lake. Project to be completed by December 31, 2023.

Project final deliverables include:
1. Results from hand-pulling efforts including time spent and amount removed
2. Annual AIS monitoring data/report
3. CBCW data entered into SWIMS
4. Final report

Specific project activities include:
1. AIS monitoring and reporting
2. Removal of CLP through hand-pulling and benthic barrier
3. Fisheries monitoring
4. CBCW efforts

Special Conditions: Monitoring design must get approval from DNR prior to management efforts. Per s. NR193.65(4) population management activities require minimum public boating access as set out in s. NR 1.91 (4) to be eligible for grant funds. The grantee is not eligible for reimbursement of expenses until these requirements are met.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/2/2007
Waters Involved
Long Lake
Status
Complete

Long Lake Improvement Association: Long Lake Eurasian Water Milfoil Control Project: Long Lake Improvement Association is sponsoring an Aquatic Invasive Species Rapid Response grant to be completed by December 31, 2007. The project will focus on chemically treating 0.25 acres of EWM in Long Lake.

Project activities include:
1) Evaluation of last fall's EWM chemical treatment
2) Identify areas with EWM and hand pull or chemically treat any EWM found
3) Post-treatment survey mid-to-late summer followed by spot treatments or hand pulling of any EWM identified

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
-Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/2/2007
Waters Involved
Long Lake Creek
Status
Complete

Long Lake Improvement Association: Long Lake Eurasian Water Milfoil Control Project: Long Lake Improvement Association is sponsoring an Aquatic Invasive Species Rapid Response grant to be completed by December 31, 2007. The project will focus on chemically treating 0.25 acres of EWM in Long Lake.

Project activities include:
1) Evaluation of last fall's EWM chemical treatment
2) Identify areas with EWM and hand pull or chemically treat any EWM found
3) Post-treatment survey mid-to-late summer followed by spot treatments or hand pulling of any EWM identified

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
-Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/30/2020
Waters Involved
Rice Lake
Status
Complete

Rice Lake Association: Pike Lake - Curly Leaf Pondweed Project: Project Scope:
The Rice Lake Association Inc. is sponsoring an AIRR grant to be completed by Dec 31, 2022. The project will focus on assessing populations and hand-pulling the influx of curly-leaf pondweed in Pike Lake and Turtle River.

Project activities include:
1. Pre/Post treatment mapping
2. Full Point-Intercept surveys
3. AIS and coarse woody habitat surveys
4. Complete annual AIS Monitoring and Control Strategy Report
5. Hand harvest of curly-leaf pondweed (CLP)

Project deliverables include:
1. Final report describing findings from all surveys
2. Point intercept survey data from 2020 and 2022
3. GPS locations of CLP with updated maps

Specific conditions for this project:
1. Annual/final reports need Dept review and approval
2. All surveys must follow DNR protocols

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) of final report, Aquatic plant survey data, GPS data and maps.




Grant Details
Aquatic Invasives Early Detection and Response
Date
3/30/2020
Waters Involved
Turtle River
Status
Complete

Rice Lake Association: Pike Lake - Curly Leaf Pondweed Project: Project Scope:
The Rice Lake Association Inc. is sponsoring an AIRR grant to be completed by Dec 31, 2022. The project will focus on assessing populations and hand-pulling the influx of curly-leaf pondweed in Pike Lake and Turtle River.

Project activities include:
1. Pre/Post treatment mapping
2. Full Point-Intercept surveys
3. AIS and coarse woody habitat surveys
4. Complete annual AIS Monitoring and Control Strategy Report
5. Hand harvest of curly-leaf pondweed (CLP)

Project deliverables include:
1. Final report describing findings from all surveys
2. Point intercept survey data from 2020 and 2022
3. GPS locations of CLP with updated maps

Specific conditions for this project:
1. Annual/final reports need Dept review and approval
2. All surveys must follow DNR protocols

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) of final report, Aquatic plant survey data, GPS data and maps.




Grant Details
Aquatic Invasives Early Detection and Response
Date
4/2/2007
Waters Involved
Unnamed
Status
Complete

Long Lake Improvement Association: Long Lake Eurasian Water Milfoil Control Project: Long Lake Improvement Association is sponsoring an Aquatic Invasive Species Rapid Response grant to be completed by December 31, 2007. The project will focus on chemically treating 0.25 acres of EWM in Long Lake.

Project activities include:
1) Evaluation of last fall's EWM chemical treatment
2) Identify areas with EWM and hand pull or chemically treat any EWM found
3) Post-treatment survey mid-to-late summer followed by spot treatments or hand pulling of any EWM identified

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
-Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/2/2007
Waters Involved
Virgin Creek
Status
Complete

Long Lake Improvement Association: Long Lake Eurasian Water Milfoil Control Project: Long Lake Improvement Association is sponsoring an Aquatic Invasive Species Rapid Response grant to be completed by December 31, 2007. The project will focus on chemically treating 0.25 acres of EWM in Long Lake.

Project activities include:
1) Evaluation of last fall's EWM chemical treatment
2) Identify areas with EWM and hand pull or chemically treat any EWM found
3) Post-treatment survey mid-to-late summer followed by spot treatments or hand pulling of any EWM identified

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
-Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Aimer Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aimer Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ambleside Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ambleside Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Annabelle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Anne Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Armour Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Averill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Averill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bambi Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bambi Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Basin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Basin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Battine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Battine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beatrice Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Belle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Belle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bena Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Birch Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 2: North Lakeland Discovery Center is sponsoring an AEPP grant to study Rainbow, Tamarack and Birch Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Rainbow, Tamarack and Birch Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 6) Hired staff; 7) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Boot Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Boot Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Borden Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Borden Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buck Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Buck Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bug Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bug Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Canteen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Canteen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Carlin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Carlin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cathaline Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cathaline Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Circle Lily Creek
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Circle Lily Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Constance Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crawford Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crawford Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cyrus Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cyrus Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Doe Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Doe Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dumbell Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dunn Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dunn Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Edith Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Edith Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Etna Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Findler Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flora Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Flora Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fox Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Geneveive Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
George Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Grant Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gretchen Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Heart Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Heart Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Helmet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Helmet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hiawatha Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
High Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
High Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jamie Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jamie Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jenny Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jenny Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jingwak Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jingwak Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
John Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
John Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Junction Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Junction Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Katinka Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Katinka Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Keego Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Keego Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Knife Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Knife Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Adelaide
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Lake Adelaide
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Franchian
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Helen
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Lake Helen
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Rose
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Yolanda
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Papoose Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lone Pine Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Pine Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lone Pine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Pine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Aimer Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lower Aimer Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lynx Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lynx Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lynx Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lynx Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mabel Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mabel Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Marion Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mary Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
McCullough Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
McCullough Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mermaid Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mermaid Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Minonk Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Minonk Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moraine Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Moraine Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moraine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Moraine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Morton Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Morton Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mud Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Murphy Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Murphy Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Nell Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
No Mans Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
No Mans Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
North Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
North Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
North Turtle Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Noseeum Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Oriole Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Oxbow Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Oxbow Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Papoose Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Papoose Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pardee Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pardee Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Pardee Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pond Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pond Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Presque Isle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Presque Springs
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Presque Springs
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rainbow Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Rainbow Creek
Status
Proposed

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 2: North Lakeland Discovery Center is sponsoring an AEPP grant to study Rainbow, Tamarack and Birch Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Rainbow, Tamarack and Birch Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 6) Hired staff; 7) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rainbow Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Rainbow Lake
Status
Proposed

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 2: North Lakeland Discovery Center is sponsoring an AEPP grant to study Rainbow, Tamarack and Birch Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Rainbow, Tamarack and Birch Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 6) Hired staff; 7) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Red Bass Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Red Bass Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Red Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Red Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rice Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rice Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rice Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rice Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rock Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rock Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rosalind Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rosalind Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Round Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Round Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Rudolph Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rudolph Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Russet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Russet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanborn Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanborn Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanford Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanford Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Sanford Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Sanford Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
South Branch Presque Isle River
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
South Turtle Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Spread Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Spread Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Stateline Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stateline Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tamarack Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Tambier Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Tambier Creek
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 2: North Lakeland Discovery Center is sponsoring an AEPP grant to study Rainbow, Tamarack and Birch Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Rainbow, Tamarack and Birch Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 6) Hired staff; 7) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Toy Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Toy Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Trostel Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Turtle River
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Twin Island Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Twin Island Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Un Spring
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
2/15/2018
Waters Involved
Unnamed
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Mgmt Planning - Phase 4: North Lakeland Discovery Center is sponsoring an Aquatic Invasive Species (AIS) Education, Prevention, & Planning grant to study multiple lakes in the Town of Winchester, Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Circle Lily and Pardee Lakes, conducting early-season AIS monitoring on Adelaide, Helen and Harris Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Upper Aimer Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Upper Aimer Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Van Vliet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wildcat Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wildcat Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Wildcat Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wildcat Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Winifred Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Winifred Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Butternut Lake
Status
Complete

Price County: Lmi-Phase Ii Butternut Wq Assessment/Modeling: The Price County Land Conservation Dept will sponsor a project which will collect all needed data to create a response model for Butternut Lake including a water budget, detailed phosphorus budget, lake water quality modeling and evaluation of groundwater impacts. Deliverables will include all data collected and a final report summarizing the findings.

DNR will be provided with a copy of reports and publications produced in both written and electronic (PDF) format. DNR will also be provided with a summary of all the efforts under this grant that are not included in reports or other written documents.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Kentuck Lake
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Lake of the Falls
Status
Complete

Lake Of The Falls Association: Lmi-Walleye Spawning Habitat Project: Lake of the Falls Association proposes to establish a Walleye Spawning Habitat Project on Lake of the Falls. The project activities will include six approved spawning beds made of approved materials. Other activities that are included besides the actual construction of the rock spawning beds are site preparation and clean-up as called for in the application.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res- L. St. Germain Lake Aeration & Phosphorus Removal Engineering: The Little St. Germain Lake Protection and Rehabilitation District is sponsoring a project involving the installation of two lake aerators for improvement of the winter lake dissolved oxygen levels, development of a preliminary engineering work scope for reduction of phosphorus loading to Little St. Germain Lake, and monitoring of inlake water chemistry, Muskellunge Creek monitoring, and groungwater monitoring to be conducted by the USGS.

Project deliverables for this grant project will be:
USGS report including data from the continued trend monitoring, phosphorus loading data from Muskellunge Creek, sources of phosphorus to Muskellunge Creek, groundwater phosphorus contribution, pre and post aeration system installation oxygen monitoring, an updated lake water and phosphorus budget, and an evaluation of the effectiveness of the aeration system.

A final report from Foth &Van Dyke will include a feasibility study for reduction of the phosphorus loading to Little St. Germain, preliminary engineering of chemical phosphorus removal and cost projections.

Specific conditions for this project include:
* The installation of all stream gauging stations and lake aeration equipment must receive the approval and/or permit from the Department of Natural Resources water regulation section.

The Department of Natural Resources will be provided with electronic and paper copies of the final report of this project.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little Saint Germain Lake
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
10/1/2009
Waters Involved
Little St Germain Creek
Status
Complete

Little St Germain Lake P & R District: Res-Restoring Shoreline Habitat On Lt. Saint Germain Lake: Little St. Germain Lake P&R District is sponsoring a project focused on restoring 500 meters of shoreline on Lt. St. Germain Lake. Partners include the USGS, VCLA, Vilas Co. LWCD, UW Ext., WDATCP, MI Tech Univ., & WDNR.

Activities include: 1) native vegetation restoration of 500 meters of shoreline & > 4000 sq. meters of lakeshore buffer; 2) terrestrial & aquatic invasives survey & treatment/removal on restored area; 3) evaluate ecological benefits of buffer restoration for wildlife & fish pops.; 4) assess feasibility of using project to conduct experiments to quantify benifits of buffer re-establishment to reduce nutrient runoff; 5) conduct experiments to develop BMP's for shoreland restoration in the Upper Wisc. River Watershed & Northern Highlands Ecological Landscape; 6) removal, replacement of retaining walls, impervious surfaces within buffer; installation of BMPs for runoff control; 7) repair shoreland erosion w/ biologically degradable materials; 8) tree drops & aquatic macrophyte bed establishment; 9) demo. & education activities including lake ecology workshops, meetings, pamphlets & newsletters; 10) implement pollinator response surveys; 11) final report summarizing project activities including restortaion before & after photos.

Deliverables: 1) 500 meters of restoration & >4000 sq. meters of buffer area; 2) invasives control; 3) installation of BMP's & erosion control measures; 4) habitat improvements (tree drops & macrophyte bed); 5) completed workshops, pamphlets & newsletters; 6) final report (w/ BMP's & nutrient run-off component).

Specific conditions: Shoreling habitat restorations require perpetual deed restrictions; final report needs Dept. review & approval.

Lake Mgt. Coor will be provided with electronic (pdf or word) & hard copy of final report & copeis of pamphlets & newsletters.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Trout Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Little Turtle River
Status
Complete

Mercer Lake Association: Lmi-Mercer Lake Water Quality,Hydrology, And Watershed Study: The Mercer Lake Association in cooperation with the Town of Mercer and the US Geological Service (USGS) will conduct a lake/watershed evaluation and develop a final lake/watershed management plan.

Project goals include:
1. Develop a water & phosphorus (including internal sediment loading) budget for Mercer Lake including a model to simulate phosphorus loading changes & predict water quality improvements.
2. Work with Mercer lake Association to analyze & interpret USGS report.
3. Determine amount of suspended solids & phosphorus entering the lake from the downtown commercial area in the Town of Mercer.
4. Analyze alternatives to treat stormwater runoff from urban area.
5. Develop sub watershed action management plan for watershed planning area.
6. Update Preliminary Lake Watershed Management Plan with USGS data; revise the Plan for Mercer Lake.
7. Present project updates at Association, Town & County meetings; invite interested parties.
8. Develop future courses of action to improve water quality in Mercer Lake.

Project deliverables include:
* Precipitation data, stream stage & flow data presented "real-time" on USGS internet site.
* Archive data in USGS computer database.
* Publish data annually in USGS, Wisconsin data reports.
* Hard copy & electronic map of Mercer Lake's watershed and land cover by USGS.
* USGS present interpretive information to the Lake Association at the annual 2011meeting.
* Technical report in the "Scientific Investigations Report" series prepared by USGS at the end of the project.
* A sub watershed action plan identifying and prioritizing recommended actions and associated costs.
* A Final Comprehensive Management Plan.

Specific conditions:
* Forward lake/watershed plan to WDNR for review and approval before adoption of the plan.
* The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lower Post Lake
Status
Complete

Post Lakes P & R District: Natural Shoreland & Habitat Project: This project will implement one of the recommendations of the Post Lakes Management Plan. The project will include development of a long-term project to support and encourage shoreland buffers and restoration of shoreland properties. The project also includes the restoration of 6 lots as education demonstration sites.

Deliverables include:
1. Development of a Natural Shorelands and Habitat Committee including DNR and County representatives to guide the development of a pilot project.
2. Development of a long-term project guide including training of volunteers to complete site assessments and an education plan.
3. Site analysis and design for 6 parcels including restoration of these sites.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Manitowish Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McCabe Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McKinney Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Mercer Lake
Status
Complete

Mercer Lake Association: Lmi-Mercer Lake Water Quality,Hydrology, And Watershed Study: The Mercer Lake Association in cooperation with the Town of Mercer and the US Geological Service (USGS) will conduct a lake/watershed evaluation and develop a final lake/watershed management plan.

Project goals include:
1. Develop a water & phosphorus (including internal sediment loading) budget for Mercer Lake including a model to simulate phosphorus loading changes & predict water quality improvements.
2. Work with Mercer lake Association to analyze & interpret USGS report.
3. Determine amount of suspended solids & phosphorus entering the lake from the downtown commercial area in the Town of Mercer.
4. Analyze alternatives to treat stormwater runoff from urban area.
5. Develop sub watershed action management plan for watershed planning area.
6. Update Preliminary Lake Watershed Management Plan with USGS data; revise the Plan for Mercer Lake.
7. Present project updates at Association, Town & County meetings; invite interested parties.
8. Develop future courses of action to improve water quality in Mercer Lake.

Project deliverables include:
* Precipitation data, stream stage & flow data presented "real-time" on USGS internet site.
* Archive data in USGS computer database.
* Publish data annually in USGS, Wisconsin data reports.
* Hard copy & electronic map of Mercer Lake's watershed and land cover by USGS.
* USGS present interpretive information to the Lake Association at the annual 2011meeting.
* Technical report in the "Scientific Investigations Report" series prepared by USGS at the end of the project.
* A sub watershed action plan identifying and prioritizing recommended actions and associated costs.
* A Final Comprehensive Management Plan.

Specific conditions:
* Forward lake/watershed plan to WDNR for review and approval before adoption of the plan.
* The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Moon Lake
Status
Complete

Alma-Moon Lake P & R District: Res-Restoring Shoreline Habitat On Moon Lake: Alma/Moon Lake P&R District is sponsoring a project focusing on restoring 1500 feet of shoreline on Moon Lake as part of a WDNR Science Services Lakeshore Restoration Research Project. Partners include UCC Moon Beach Camp, Michigan Technical University and WDNR.

Project activities include: 1) Native vegetation restoration of 1500 feet of shoreline & >4000 square meters of lakeshore buffer area; 2) Survey of restoration area for terrestrial & aquatic invasives - all encountered will be treated &/or removed; 3) Install & maintain an 8' fence & 3' hardware cloth for 3-4 years for site protection from deer & snowshoe hares; 4) Install rain gardens along areas of significant run-off; 5) Install enviro-lock biodegradable bags along areas of significant erosion; 6) 4-6 trees will be dropped & establishment of an aquatic macrophyte bed in the restoration area; 7) Shoreline restoration demonstration & education activities including lake ecology workshops, creating pamphlets, hand-outs & video DVD's, signage, brochures, & an updated Moon Beach website detailing project progress; 8) Final report summarizing project activities, including before and after photographs of restored areas.

Project deliverables include: 1)1500 feet of restored shoreline and >4000 square meters of lakeshore buffer area; 2) Treatment &/or removal of invasive species; 3) Installed rain gardens and erosion control measures; 4) Habitat improvements (tree drops and macrophyte bed); 5) Completed workshops, pamphlets, hand-outs, video DVD's, signage, brochures, and website updates; 6) Final report.

Specific Conditionst: Shoreland habitat restorations require perpetual deed restrictions; Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, and copies of pamphlets, brochures, hand-outs, and DVD's and any established protocols for tree drops and aquatic macrophyte bed establishment.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pier Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Pixley Flowage
Status
Complete

Price County: Acq-Price County-Smith Lake Land Acquisition: Price County will acquire 93.5 acres of land with 6,800 feet of undeveloped frontage on Smith Lake, a flowage of the Flambeau River.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Rest Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sherman Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Spider Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Statehouse Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 1
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 2
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stepping Stone Lake Number 3
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Stone Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Sturgeon Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Tahoe Creek
Status
Complete

Mercer Lake Association: Lmi-Mercer Lake Water Quality,Hydrology, And Watershed Study: The Mercer Lake Association in cooperation with the Town of Mercer and the US Geological Service (USGS) will conduct a lake/watershed evaluation and develop a final lake/watershed management plan.

Project goals include:
1. Develop a water & phosphorus (including internal sediment loading) budget for Mercer Lake including a model to simulate phosphorus loading changes & predict water quality improvements.
2. Work with Mercer lake Association to analyze & interpret USGS report.
3. Determine amount of suspended solids & phosphorus entering the lake from the downtown commercial area in the Town of Mercer.
4. Analyze alternatives to treat stormwater runoff from urban area.
5. Develop sub watershed action management plan for watershed planning area.
6. Update Preliminary Lake Watershed Management Plan with USGS data; revise the Plan for Mercer Lake.
7. Present project updates at Association, Town & County meetings; invite interested parties.
8. Develop future courses of action to improve water quality in Mercer Lake.

Project deliverables include:
* Precipitation data, stream stage & flow data presented "real-time" on USGS internet site.
* Archive data in USGS computer database.
* Publish data annually in USGS, Wisconsin data reports.
* Hard copy & electronic map of Mercer Lake's watershed and land cover by USGS.
* USGS present interpretive information to the Lake Association at the annual 2011meeting.
* Technical report in the "Scientific Investigations Report" series prepared by USGS at the end of the project.
* A sub watershed action plan identifying and prioritizing recommended actions and associated costs.
* A Final Comprehensive Management Plan.

Specific conditions:
* Forward lake/watershed plan to WDNR for review and approval before adoption of the plan.
* The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Tambling Lake
Status
Complete

Tambling Lake Association, Inc.: Res-Tambling Lake Aeration System: The Tambling Lake Association, Inc. will sponsor a project for the installation of one aeration system. The DNR will be provided with a written summary of the work completed under this grant and photographs.


Grant Details
Lake Protection Grant
Date
2/14/1996
Waters Involved
Torch Lake
Status
Complete

Vilas County: Acq-Torch Lake Land Acquisition - Crist Property: Vilas County will acquire 60 acres of land with frontage on Torch Lake and the Wisconsin River for lake protection and public outdoor recreation purposes. Eligible costs are outlined on the attached Cost Estimate Worksheet. PER SPONSOR: PROJECT FELL THROUGH; GRANT AWARD WITHDRAWN.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Trude Lake
Status
Complete

Iron County: Res - Trude Lake Shoreline Stabilization: Project Scope and Description of Deliverables

Iron County LWCD is sponsoring a surface water restoration grant to assist private landowners on shoreland restoration projects that will protect walleye spawning areas and promote water quality in Trude Lake, Iron County.

Project final deliverables include: Final report, conservation covenants and restored shorelines.

Specific project activities include: 1) Provide technical assistance and cost-share to 3 Trude Lake landowners for erosion concerns and/or stormwater runoff issues; 2) A conservation covenant will be placed on the landowner's deed, requiring the shoreland protection practice to be maintained in perpetuity to protect this investment; 3) Develop final report with pictures of before/after restoration.

Special Conditions: 1) Draft of final report needs Dept review and approval.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive an electronic .pdf copy of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Un Spring
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Unnamed
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete

Kentuck Lake P&R District: Lmi-Df-Kentuck Lake Plan Implementation: Water Quality & Ais: Kentuck Lake P&R District is sponsoring a lake protection grant to further assess water quality and manage AIS in Kentuck Lake, in Vilas County.

Project activities include: 1) In-lake water quality assessment; 2) Groundwater assessment; 3) Sediment core collection; 4) EWM and CLP monitoring and mapping; 5) Stakeholder participation planning meeting; 6) Purchase LDO probe; 7) Develop annual report and final report.

Project deliverables include: 1) In-lake, groundwater and sediment core data; 2) EWM and CLP data and mapping; 3) LDO probe; 4) Annual summary and final report.

Specific conditions for this project: Annual summary and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual summary, final report, all maps, data and GIS from project.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Vance Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wild Rice Lake
Status
Complete

Town Of Manitowish Waters: Lmi-Df-Town Of Manitowish Waters: This project will complete a Smart Growth compliant plan for the Township of Manitowish Waters. Specifically, this grant will cover portions of the agricultural/natural resources/cultural, internal governmental, land use, and implementation strategy elements.

Specific deliverables for this grant project include:
1. A comprehensive plan document
2. Report maps including:
A. Natural and Cultural Resource maps including delineation of environmental corridors, fish & wildlife habitat, unique features/scenic view areas, and land and resource protection areas.
B. Transportation
C. Vegetative cover types
D. Utilities and service area maps
E. Surface water data maps including drainage ways, floodplain/shoreland zoning areas, wetlands, and watershed boundaries
F. Existing land use
G. Existing zoning
H. Year 2021 Preferred Land Uses
3. Presentation materials for information and education

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the comprehensive plan report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and/or local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Flambeau River
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Turtle Flambeau Flowage Water Quality Monitoring: The Turtle Flambeau Flowage/Trude Lake Property Owners Association is sponsoring a grant to evaluate the present and historical water-quality or the flowage; to develop a spatial and temporal description of the water-quality throughout the Flowage; and determine if the Flowage water-quality has changed since monitoring began. Information will be used to better understand the flowage water quality and provide background information to aid in the development of the assessment/appraisal report.

Project goals include: 1) Determine the current water quality and trophic status of the Flowage and provide data describing its condition in comparison with historical and existing self-help data; 2) Systematically evaluate the water-quality data being collected as part the WDNR Citizen Monitoring Program; 3) Assemble and summarize existing data to help provide a description of how the water quality in the Flowage has fluctuated; 4) Provide information on initial results and further study recommendations to Association members, TFFTL user groups, and the general public; 5) Develop an assessment/appraisal report outlining additional data collection needs (if justified) and steps for creation of a comprehensive management plan (through a diagnostic feasibility study).

Project deliverables include: 1) an assessment/appraisal report documenting water quality results and priority issues identified by association members (from a separate study); 2) A compilation of aquatic plant species found in the TFFTL and a habitat characterization; 3) An analysis and summary of existing land use; 4) A group of articles highlighting water-quality work will be compiled and made available to the public; 5) evaluation summary of existing vs. historical water quality.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Little Turtle River
Status
Complete

Mercer Lake Association: Mercer Lake Planning Grant Phase 1: Mercer Lake Association will conduct a lake/watershed evaluation and develop a lake/watershed management plan.

The project includes: 1) meetings with Mercer Lake Association, Town of Mercer and WI DNR 2) background data collection of Mercer Lake 3) field reconnaissance 4) define watershed and sub-watershed drainage areas 5) categorize present and future land use of lake/watershed area 6) identify existing soil condition, wetlands and surface waters 7) characterize quality of existing lake/watershed discharges 8) conduct numerical analysis of water quantity and water quality 9) develop water quality analysis 10) detailed analysis of current lake monitoring activities 11) conduct a community wide sociological survey 12) evaluate watershed best management practices (BMP's) 14) develop a Mercer Lake/Watershed Management Plan with implementation strategies

Project deliverables include:
- Detailed analysis of water quality sampling results and Mercer Lake's TSI
- Summary of educational activities and public presentations throughout project
- Results and interpretation of community wide sociological survey
- Mercer Lake/Watershed Management Plan will be developed with detailed sections of watershed BMP's, ordinances, information and education, and easements

Specific conditions for this project: A) Project design plans, sociological survey questions, and Mercer Lake Management Plan need review and approval from Lakes Coordinator before project begins and adoption of final management recommendations. B) Applicant is required to provide a mid-term project update.

Wisconsin Department of Natural Resources Lakes Coordinator will be provided with electronic (pdf) and hard copies (2) of Mercer Lake Management Plan, blank data form used for sociological survey, and all raw data in electronic format. Project results will be disseminated to the public via a presentations to Mercer Lake Association and Town of Mercer.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Little Turtle River
Status
Complete

Mercer Lake Association: Mercer Lake Planning Grant Phase Ii: Mercer Lake Association will conduct a lake/watershed evaluation and develop a lake/watershed management plan.

The project includes: 1) meetings with Mercer Lake Association, Town of Mercer and WI DNR 2) background data collection of Mercer Lake 3) field reconnaissance 4) define watershed and sub-watershed drainage areas 5) categorize present and future land use of lake/watershed area 6) identify existing soil condition, wetlands and surface waters 7) characterize quality of existing lake/watershed discharges 8) conduct numerical analysis of water quantity and water quality 9) develop water quality analysis 10) detailed analysis of current lake monitoring activities 11) conduct a community wide sociological survey 12) evaluate watershed best management practices (BMP's) 14) develop a Mercer Lake/Watershed Management Plan with implementation strategies

Project deliverables include:
- Detailed analysis of water quality sampling results and Mercer Lake's TSI
- Summary of educational activities and public presentations throughout project
- Results and interpretation of community wide sociological survey
- Mercer Lake/Watershed Management Plan will be developed with detailed sections of watershed BMP's, ordinances, information and education, and easements

Specific conditions for this project:
- Project design plans, sociological survey questions, and Mercer Lake Management Plan need review and approval from Lakes Coordinator before project begins and adoption of final management recommendations.
- Applicant is required to provide a mid-term project update.

Wisconsin Department of Natural Resources Lakes Coordinator will be provided with electronic (pdf) and hard copies (2) of Mercer Lake Management Plan, blank data form used for sociological survey, and all raw data in electronic format. Project results will be disseminated to the public via a presentations to Mercer Lake Association and Town of Mercer.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Little Turtle River
Status
Complete

Mercer Lake Association: Mercer Lake Development Of An Aquatic Plant Management Plan, Phase 1: The Mercer Lake Association is sponsoring a project to develop an Aquatic Plant Management Plan for Mercer Lake.

The project includes the following goals: 1) Complete a point-intercept aquatic plant survey on Mercer Lake (Phase I/this grant); 2) Determine if any invasive species are present in Mercer Lake (Phase I); 3) Develop am APM Plan for Mercer Lake (Phase II/will apply February 1, 2010); 4) Integrate this planning process with the ongoing effort of revising the Mercer Lake Management plan.

Project deliverables include: 1) A final report summarizing the aquatic plant survey including the raw data (phase I); 2) Discussion of presence or absence of invasive species; 3) A final APM Plan for Mercer Lake following department and UW-Extension guidelines (phase II) 4) WDNR to be provided with electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Mercer Lake
Status
Complete

Mercer Lake Association: Mercer Lake Association Paleocore Analysis: The Mercer Lake Association is sponoring a project which will complete a sediment core analysis to address existing water quality questions and assist in future planning efforts. The project includes a detailed core analysis on Mercer Lake and a less detailed, pre and post development analysis on Grand Portage Lake. Deliverables include: a written report detailing water quality changes found in both cores and an analysis of the significance of findings. This report will be shared with the public via press releases to surrounding communities, archived at the local library and presentation at the Mercer Lake Association annual meeting. This report will be provided to the Department in electronic (pdf) and hard copy format.

***Please note that approval of the final report for final payment by the Lake Grant Program does not indicate Department approval of recommendations or strategies within the report.

**Paul Garrison, DNR Research, will handle SLOH costs associated with this project via individual contract with the SLOH and with the Mercer Lake Association.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Mercer Lake
Status
Complete

Mercer Lake Association: Mercer Lake Planning Grant Phase 1: Mercer Lake Association will conduct a lake/watershed evaluation and develop a lake/watershed management plan.

The project includes: 1) meetings with Mercer Lake Association, Town of Mercer and WI DNR 2) background data collection of Mercer Lake 3) field reconnaissance 4) define watershed and sub-watershed drainage areas 5) categorize present and future land use of lake/watershed area 6) identify existing soil condition, wetlands and surface waters 7) characterize quality of existing lake/watershed discharges 8) conduct numerical analysis of water quantity and water quality 9) develop water quality analysis 10) detailed analysis of current lake monitoring activities 11) conduct a community wide sociological survey 12) evaluate watershed best management practices (BMP's) 14) develop a Mercer Lake/Watershed Management Plan with implementation strategies

Project deliverables include:
- Detailed analysis of water quality sampling results and Mercer Lake's TSI
- Summary of educational activities and public presentations throughout project
- Results and interpretation of community wide sociological survey
- Mercer Lake/Watershed Management Plan will be developed with detailed sections of watershed BMP's, ordinances, information and education, and easements

Specific conditions for this project: A) Project design plans, sociological survey questions, and Mercer Lake Management Plan need review and approval from Lakes Coordinator before project begins and adoption of final management recommendations. B) Applicant is required to provide a mid-term project update.

Wisconsin Department of Natural Resources Lakes Coordinator will be provided with electronic (pdf) and hard copies (2) of Mercer Lake Management Plan, blank data form used for sociological survey, and all raw data in electronic format. Project results will be disseminated to the public via a presentations to Mercer Lake Association and Town of Mercer.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Mercer Lake
Status
Complete

Mercer Lake Association: Mercer Lake Planning Grant Phase Ii: Mercer Lake Association will conduct a lake/watershed evaluation and develop a lake/watershed management plan.

The project includes: 1) meetings with Mercer Lake Association, Town of Mercer and WI DNR 2) background data collection of Mercer Lake 3) field reconnaissance 4) define watershed and sub-watershed drainage areas 5) categorize present and future land use of lake/watershed area 6) identify existing soil condition, wetlands and surface waters 7) characterize quality of existing lake/watershed discharges 8) conduct numerical analysis of water quantity and water quality 9) develop water quality analysis 10) detailed analysis of current lake monitoring activities 11) conduct a community wide sociological survey 12) evaluate watershed best management practices (BMP's) 14) develop a Mercer Lake/Watershed Management Plan with implementation strategies

Project deliverables include:
- Detailed analysis of water quality sampling results and Mercer Lake's TSI
- Summary of educational activities and public presentations throughout project
- Results and interpretation of community wide sociological survey
- Mercer Lake/Watershed Management Plan will be developed with detailed sections of watershed BMP's, ordinances, information and education, and easements

Specific conditions for this project:
- Project design plans, sociological survey questions, and Mercer Lake Management Plan need review and approval from Lakes Coordinator before project begins and adoption of final management recommendations.
- Applicant is required to provide a mid-term project update.

Wisconsin Department of Natural Resources Lakes Coordinator will be provided with electronic (pdf) and hard copies (2) of Mercer Lake Management Plan, blank data form used for sociological survey, and all raw data in electronic format. Project results will be disseminated to the public via a presentations to Mercer Lake Association and Town of Mercer.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Mercer Lake
Status
Complete

Mercer Lake Association: Mercer Lake Development Of An Aquatic Plant Management Plan, Phase 1: The Mercer Lake Association is sponsoring a project to develop an Aquatic Plant Management Plan for Mercer Lake.

The project includes the following goals: 1) Complete a point-intercept aquatic plant survey on Mercer Lake (Phase I/this grant); 2) Determine if any invasive species are present in Mercer Lake (Phase I); 3) Develop am APM Plan for Mercer Lake (Phase II/will apply February 1, 2010); 4) Integrate this planning process with the ongoing effort of revising the Mercer Lake Management plan.

Project deliverables include: 1) A final report summarizing the aquatic plant survey including the raw data (phase I); 2) Discussion of presence or absence of invasive species; 3) A final APM Plan for Mercer Lake following department and UW-Extension guidelines (phase II) 4) WDNR to be provided with electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Large Scale Lake Planning
Date
4/1/2005
Waters Involved
Rice Lake
Status
Complete

Rice Lake Property Owners Association: Lake Management Planning For Rice & Echo Lakes: The Rice Lake Property Owners Association in collaboration with Echo Lake Association, Iron County Lakes Alliance, Northwest Regional Planning Commission and ABDI Land and Water Conservation Department is sponosring a project to create a comprehensive lake management plan that addresses issues of decreased water clarity, increased aquatic plant growth, public opinion and future development pressures. All existing lake data as well as historic photographs, maps, etc. will be collected by lake association volunteers. Volunteers will also help the consultant conduct water quality monitoring. The Northwest Regional Planning Commission will prepare base maps of the two lakes including: existing land use, land ownership, soils, slope, groundwater and other related natural features. The Iron County UW-Extension (with the help of the lake associations) will prepare and distribute a lake opinion survey to all lake property owners. UW-Extension will analyze the results and share them with the lake associations and the public. A consultant will combine all of the above to create a lake management plan.

Products: 1. Base maps of land area surrounding both lakes. 2. Propery owner survey results in tabular form. 3. Water quality data into state database. 4. Analysis of existing lake data. 5. Lake management plan incorporating all of the above. 6. Quarterly lake association (combined) newsletter w/ project updates.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Rice Lake
Status
Complete

Rice Lake Property Owners Association: Aquatic Plant Management Planning For Rice Lake: The Rice Lake Property Owners Association is sponsoring a project to develop an Aquatic Plant Management Plan for Rice Lake.

The project includes the following goals: 1) Complete a point-intercept aquatic plant survey on Rice Lake; 2) Gain a better understanding of the aquatic plant community and how to manage; 3) Determine if any invasive species are present in Rice Lake; 4) Develop am APM Plan for Rice Lake; 5) Integrate this planning process with Rice Lake\2019s 2005 Lake Management Plan..

Project deliverables include: 1) A final report summarizing the aquatic plant survey including the raw data; 2) Discussion of presence or absence of invasive species; 3) A final APM Plan for Rice Lake following department and UW-Extension guidelines; 4) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Turtle Flambeau Flowage
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Turtle Flambeau Flowage Water Quality Monitoring: The Turtle Flambeau Flowage/Trude Lake Property Owners Association is sponsoring a grant to evaluate the present and historical water-quality or the flowage; to develop a spatial and temporal description of the water-quality throughout the Flowage; and determine if the Flowage water-quality has changed since monitoring began. Information will be used to better understand the flowage water quality and provide background information to aid in the development of the assessment/appraisal report.

Project goals include: 1) Determine the current water quality and trophic status of the Flowage and provide data describing its condition in comparison with historical and existing self-help data; 2) Systematically evaluate the water-quality data being collected as part the WDNR Citizen Monitoring Program; 3) Assemble and summarize existing data to help provide a description of how the water quality in the Flowage has fluctuated; 4) Provide information on initial results and further study recommendations to Association members, TFFTL user groups, and the general public; 5) Develop an assessment/appraisal report outlining additional data collection needs (if justified) and steps for creation of a comprehensive management plan (through a diagnostic feasibility study).

Project deliverables include: 1) an assessment/appraisal report documenting water quality results and priority issues identified by association members (from a separate study); 2) A compilation of aquatic plant species found in the TFFTL and a habitat characterization; 3) An analysis and summary of existing land use; 4) A group of articles highlighting water-quality work will be compiled and made available to the public; 5) evaluation summary of existing vs. historical water quality.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Turtle River
Status
Complete

Rice Lake Property Owners Association: Aquatic Plant Management Planning For Rice Lake: The Rice Lake Property Owners Association is sponsoring a project to develop an Aquatic Plant Management Plan for Rice Lake.

The project includes the following goals: 1) Complete a point-intercept aquatic plant survey on Rice Lake; 2) Gain a better understanding of the aquatic plant community and how to manage; 3) Determine if any invasive species are present in Rice Lake; 4) Develop am APM Plan for Rice Lake; 5) Integrate this planning process with Rice Lake\2019s 2005 Lake Management Plan..

Project deliverables include: 1) A final report summarizing the aquatic plant survey including the raw data; 2) Discussion of presence or absence of invasive species; 3) A final APM Plan for Rice Lake following department and UW-Extension guidelines; 4) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
Small Scale Lake Planning
Date
4/1/2014
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Bear River Comprehensive Lake Management Plan: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant to print and distribute copies of the Bear River Management Plan within the Town of Lac du Flambeau, Vilas County, as a final step in a lake management planning effort.

Project activities include: 1) Print and distribute draft copies of plan; 2) Presentations of draft plan; 3) Develop final plan and distribute.

Project deliverables include: 1) Presentations; 2) Draft and final report.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and any other educational products from project.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Beaver Creek
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Acquisition Of Dissolved Oxygen Meter: Turtle Flambeau Flowage Trude Lake Property Owner's Association is sponsoring a small scale lake planning grant to study Turtle Flambeau Flowage and Trude Lake in Iron County with a study completion date of December 31, 2007. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling.

Project activities include:
1) Purchase YSI 550A-100 DO Meter, membrane kit and carrying case
2) Perform DO/Temp profiles as part of CLMN sampling
3) Submit DO/Temp profile data to WDNR
4) Present sampling results in newsletter

Project deliverables include:
1) YSI 550A-100 meter
2) DO/Temp profiles
3) Newsletter article/grant final report

Specific conditions for this project:
- The WDNR is currently reviewing DO meters and specifications for purchase, including costs, accuracy, and user friendliness. Contact Kevin Gauthier, Lakes Management Coordinator before purchasing the YSI meter to discuss status of review and any potential grant amendments.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of newsletter article/grant final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2014
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Bear River Comprehensive Lake Management Plan: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant to print and distribute copies of the Bear River Management Plan within the Town of Lac du Flambeau, Vilas County, as a final step in a lake management planning effort.

Project activities include: 1) Print and distribute draft copies of plan; 2) Presentations of draft plan; 3) Develop final plan and distribute.

Project deliverables include: 1) Presentations; 2) Draft and final report.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and any other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2014
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Bear River Comprehensive Lake Management Plan: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant to print and distribute copies of the Bear River Management Plan within the Town of Lac du Flambeau, Vilas County, as a final step in a lake management planning effort.

Project activities include: 1) Print and distribute draft copies of plan; 2) Presentations of draft plan; 3) Develop final plan and distribute.

Project deliverables include: 1) Presentations; 2) Draft and final report.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and any other educational products from project.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Flambeau River
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Acquisition Of Dissolved Oxygen Meter: Turtle Flambeau Flowage Trude Lake Property Owner's Association is sponsoring a small scale lake planning grant to study Turtle Flambeau Flowage and Trude Lake in Iron County with a study completion date of December 31, 2007. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling.

Project activities include:
1) Purchase YSI 550A-100 DO Meter, membrane kit and carrying case
2) Perform DO/Temp profiles as part of CLMN sampling
3) Submit DO/Temp profile data to WDNR
4) Present sampling results in newsletter

Project deliverables include:
1) YSI 550A-100 meter
2) DO/Temp profiles
3) Newsletter article/grant final report

Specific conditions for this project:
- The WDNR is currently reviewing DO meters and specifications for purchase, including costs, accuracy, and user friendliness. Contact Kevin Gauthier, Lakes Management Coordinator before purchasing the YSI meter to discuss status of review and any potential grant amendments.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of newsletter article/grant final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Fourmile Creek
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Acquisition Of Dissolved Oxygen Meter: Turtle Flambeau Flowage Trude Lake Property Owner's Association is sponsoring a small scale lake planning grant to study Turtle Flambeau Flowage and Trude Lake in Iron County with a study completion date of December 31, 2007. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling.

Project activities include:
1) Purchase YSI 550A-100 DO Meter, membrane kit and carrying case
2) Perform DO/Temp profiles as part of CLMN sampling
3) Submit DO/Temp profile data to WDNR
4) Present sampling results in newsletter

Project deliverables include:
1) YSI 550A-100 meter
2) DO/Temp profiles
3) Newsletter article/grant final report

Specific conditions for this project:
- The WDNR is currently reviewing DO meters and specifications for purchase, including costs, accuracy, and user friendliness. Contact Kevin Gauthier, Lakes Management Coordinator before purchasing the YSI meter to discuss status of review and any potential grant amendments.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of newsletter article/grant final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2014
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Bear River Comprehensive Lake Management Plan: The Town of Lac du Flambeau is sponsoring a small scale lake planning grant to print and distribute copies of the Bear River Management Plan within the Town of Lac du Flambeau, Vilas County, as a final step in a lake management planning effort.

Project activities include: 1) Print and distribute draft copies of plan; 2) Presentations of draft plan; 3) Develop final plan and distribute.

Project deliverables include: 1) Presentations; 2) Draft and final report.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and any other educational products from project.


Grant Details
Small Scale Lake Planning
Date
4/1/2003
Waters Involved
Mercer Lake
Status
Complete

Mercer Lake Association: Mercer Lake Association Mercer Lake Apm Plan: The Mercer Lake Association is sponoring a project which will complete an aquatic plant survey and management plan for Mercer Lake. The survey method will be appropriate to the lake and written approved from Laura Herman, Department Aquatic Plant Specialist prior to beginning work. Deliverables include: A technical report detailing survey results, an aquatic plant management plan with recommendations and implementation strategies, voucher specimens must be submitted to the Department for review and will be retained by the Lake Association.

Reports and other documentation will be provided to the Department in electronic (pdf) and hard copy format.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Otter Creek
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Acquisition Of Dissolved Oxygen Meter: Turtle Flambeau Flowage Trude Lake Property Owner's Association is sponsoring a small scale lake planning grant to study Turtle Flambeau Flowage and Trude Lake in Iron County with a study completion date of December 31, 2007. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling.

Project activities include:
1) Purchase YSI 550A-100 DO Meter, membrane kit and carrying case
2) Perform DO/Temp profiles as part of CLMN sampling
3) Submit DO/Temp profile data to WDNR
4) Present sampling results in newsletter

Project deliverables include:
1) YSI 550A-100 meter
2) DO/Temp profiles
3) Newsletter article/grant final report

Specific conditions for this project:
- The WDNR is currently reviewing DO meters and specifications for purchase, including costs, accuracy, and user friendliness. Contact Kevin Gauthier, Lakes Management Coordinator before purchasing the YSI meter to discuss status of review and any potential grant amendments.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of newsletter article/grant final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Rice Lake
Status
Complete

Rice Lake Property Owners Association: Rice Lake Critical Habitat Analysis: Rice Lake Property Owners Association is sponsoring a small scale lake planning grant to study Rice Lake, Iron County. The project will focus on completing a critical habitat survey on Rice Lake.

Project activities include: 1) Conduct critical habitat survey; 2) Stakeholder involvement and educational activities: kick-off meeting, press releases and newsletter articles; 3) Develop final report.

Project deliverables include: 1) Critical habitat survey data and maps; 2) Press releases and newsletter articles; 3) Final report.

Specific conditions for this project: - Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and data from the project and any other educational products from project.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Turtle Flambeau Flowage
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Acquisition Of Dissolved Oxygen Meter: Turtle Flambeau Flowage Trude Lake Property Owner's Association is sponsoring a small scale lake planning grant to study Turtle Flambeau Flowage and Trude Lake in Iron County with a study completion date of December 31, 2007. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling.

Project activities include:
1) Purchase YSI 550A-100 DO Meter, membrane kit and carrying case
2) Perform DO/Temp profiles as part of CLMN sampling
3) Submit DO/Temp profile data to WDNR
4) Present sampling results in newsletter

Project deliverables include:
1) YSI 550A-100 meter
2) DO/Temp profiles
3) Newsletter article/grant final report

Specific conditions for this project:
- The WDNR is currently reviewing DO meters and specifications for purchase, including costs, accuracy, and user friendliness. Contact Kevin Gauthier, Lakes Management Coordinator before purchasing the YSI meter to discuss status of review and any potential grant amendments.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of newsletter article/grant final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Turtle River
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Acquisition Of Dissolved Oxygen Meter: Turtle Flambeau Flowage Trude Lake Property Owner's Association is sponsoring a small scale lake planning grant to study Turtle Flambeau Flowage and Trude Lake in Iron County with a study completion date of December 31, 2007. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling.

Project activities include:
1) Purchase YSI 550A-100 DO Meter, membrane kit and carrying case
2) Perform DO/Temp profiles as part of CLMN sampling
3) Submit DO/Temp profile data to WDNR
4) Present sampling results in newsletter

Project deliverables include:
1) YSI 550A-100 meter
2) DO/Temp profiles
3) Newsletter article/grant final report

Specific conditions for this project:
- The WDNR is currently reviewing DO meters and specifications for purchase, including costs, accuracy, and user friendliness. Contact Kevin Gauthier, Lakes Management Coordinator before purchasing the YSI meter to discuss status of review and any potential grant amendments.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of newsletter article/grant final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Turtle River
Status
Complete

Rice Lake Property Owners Association: Rice Lake Critical Habitat Analysis: Rice Lake Property Owners Association is sponsoring a small scale lake planning grant to study Rice Lake, Iron County. The project will focus on completing a critical habitat survey on Rice Lake.

Project activities include: 1) Conduct critical habitat survey; 2) Stakeholder involvement and educational activities: kick-off meeting, press releases and newsletter articles; 3) Develop final report.

Project deliverables include: 1) Critical habitat survey data and maps; 2) Press releases and newsletter articles; 3) Final report.

Specific conditions for this project: - Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all maps and data from the project and any other educational products from project.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Turtle Flambeau Flowage Trade Lake Property: Acquisition Of Dissolved Oxygen Meter: Turtle Flambeau Flowage Trude Lake Property Owner's Association is sponsoring a small scale lake planning grant to study Turtle Flambeau Flowage and Trude Lake in Iron County with a study completion date of December 31, 2007. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling.

Project activities include:
1) Purchase YSI 550A-100 DO Meter, membrane kit and carrying case
2) Perform DO/Temp profiles as part of CLMN sampling
3) Submit DO/Temp profile data to WDNR
4) Present sampling results in newsletter

Project deliverables include:
1) YSI 550A-100 meter
2) DO/Temp profiles
3) Newsletter article/grant final report

Specific conditions for this project:
- The WDNR is currently reviewing DO meters and specifications for purchase, including costs, accuracy, and user friendliness. Contact Kevin Gauthier, Lakes Management Coordinator before purchasing the YSI meter to discuss status of review and any potential grant amendments.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of newsletter article/grant final report.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Duroy Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Elk River
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Grassy Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Lac Sault Dore
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Musser Flowage
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Grant Details
River Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete

Price County: Weger Streambank Protection, Elk River: Price County is sponsoring a project to restore 250 feet of shoreline habitat along the Elk River. There is an unstable 25 foot face that is actively eroding and needs to be stabilized. Fish, wildlife habitat and water quality will be improved.

Project goals: 1) Reduce sediment and nutrient delivery; 2) Reduce instream sedimentation to improve fish spawning habitat; 3) Restore shore land habitat for wildlife; 4) Improve water quality; 5) Protect existing resources.

Project deliverables is a final report that includes: 1) Documentation that the project was completed; 2) Copies of final engineering plans; 3) Before and after photo documentation.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Volunteer Monitoring

One Level 3 project was implemented in the UC14-Flambeau Flowage Watershed in 2010 utilizing volunteer assistance at three stations (SWIMS project ID: Turtle_Flambeau) to monitor the Turtle Flambeau Flowage. Volunteers collected and submitted samples for laboratory analysis of temperature, total phosphorus and chlorophyll a. All data were uploaded into the SWIMS database http://prodoasjava.dnr.wi.gov/swims/welcome.do) from the State Lab of Hygiene.

Date  2012

Grants and Management Projects
Flambeau Flowage Watershed

Goals

5/27/2015
Reevaluating all previously impaired waters for fish advise based on previous advice criteria and reevaluate for impaired waters listings (mercury).

Priorities

5/27/2015
Evaluate pass through grant recommendations and identify specific actions that DNR can work on with local partners and regional organizations. ie., The Mercer Lake Association, Town of Mercer and the USGS's watershed plan for the area.
5/27/2015
Monitor groundwater quality as land use changes continue in the watershed.
5/27/2015
Protecting high quality waters in the watershed.
5/27/2015
Finish entering all waters in watershed into the assessment database.
Watershed Recommendations
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
Rock Lake - Monitor for Fish Tissue
11/15/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
North Turtle Lake Monitor for Fish Tissue
11/7/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
South Turtle Lake - Monitor for fish tissue.
10/28/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
Birch Lake Monitor for fish tissue.
10/28/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
Long Lake - Monitor for fish tissue.
10/24/2011
Proposed
Projects
 
Water Quality Planning
Mercer Lake Management
Date
Status
Evaluate recommendations from Mercer Lake Management (2014) and identify key recommendations for management.
5/27/2015
Proposed
 
Flambeau Flowage WatershedWater Plans and PartnershipsRead the Watershed Plan

2011 Flambeau Flowage Watershed (UC14) Draft Water Quality Management Plan

Date  2011

Watershed History Note

The Flambeau Flowage watershed includes the Turtle-Flambeau Flowage which was created in 1926 when the Chippewa and Flambeau Improvement Company built a dam on the Flambeau River downstream from its confluence with the Turtle River. The dam flooded 16 natural lakes and formed an impoundment of approximately 14,000 acres. The flowage was constructed as a reservoir to augment river flows and sustain hydroelectric plants operated downstream by electric utilities and paper mills. The dam also provided flood protection and created a unique recreational resource. Many early resorts located around the 16 lakes were flooded and forced to move; some chose higher ground, others left the area. As compensation for property lost when the flowage was built, property owners were offered money or adjacent land. Most chose a cash settlement and the shoreline today remains sparsely developed. Over the years these resorts have had many visitors, some of them notorious. John Dillinger frequented the area. Al Capone, the Chicago gangster, fished the flowage many times, especially in the years after his release from prison. Charlie Comiskey, founder of the White Sox baseball team, used Jerome's Hunting and Fishing Club on Trude Lake as a place for rest and relaxation for himself and his team. In 1990, the S tewardship Fund allowed the state to acquire 22,343 acres from the Chippewa and Flambeau Improvement Company, including lands submerged by the flowage -- about 95 percent of the shoreline and adjacent lands. With additional acquisitions, state ownership now comprises approximately 27,000 acres including over 300 miles of shoreline and 195 islands. The flowage is managed by the Department of Natural Resources using a master plan developed with citizen advice. Management practices aim to perpetuate the natural character of the shoreline, preserve its scenic qualities and protect its plant and animal communities. The Flowage has the highest number of bald eagle, osprey, and common loon breeding pairs in Wisconsin.

Date  2010